Asphalt Plus
  • Home
  • ECR Information
  • About Us
  • Video Gallery
  • Performance
    • Case Studies
    • Project Sites
    • Independent Evaluations of Dry Mix
  • Technical Data
    • Specifications
      • Sample Municipal Specification
      • Sample Testing Guidance
      • GA DOT Specification
      • IL Tollway Specification
    • Technical Data Sheet
    • Technical Bulletins
    • MSDS
    • Product Storage
  • FAQ
  • Contact Us
Select Page

Case Studies

Asphalt Plus engineered rubber has endured a wide range of harsh climate & road use conditions. In spite of those tough situations, Asphalt Plus has performed impeccably well with nearly 2 million tons of placed Dry Mix Asphalt. The following case studies are a few examples of this stellar performance.

Interstate 88 – Illinois Tollway Paving Project Near Rochelle, Illinois

Valparaiso University

Pumphries Road, Texas 2007

I-75, Valdosta, Georgia 2010

I-75, Macon, GA 2006

Rt 57, Georgia 2008

Wolf Lake Terminal, Indiana 2008

IDEKER I-35 Liberty, MO

More Case Studies
LinkedIn
Facebook
Rubberized Asphalt Information
Rubber Asphalt Case Study
Benefits of Rubber Asphalt

Recent Posts

  • Wet Process vs Dry Process Rubberized Asphalt: Why Dry Process is More Efficient
  • Dry Process Engineered Crumb Rubber: Odessa Texas
  • NCAT Draft Synopsis 24-01
  • ECR Improves Interstate Highway Safety and Performance
  • RED’S RIDE ACROSS OKLAHOMA ROLLS

Contact Info

Asphalt Plus
18 E. Dundee Rd Barrington, IL 60010
Phone: (847) 639-1176
Email: info@asphaltplus.com

Recent Posts

  • Wet Process vs Dry Process Rubberized Asphalt: Why Dry Process is More Efficient
  • Dry Process Engineered Crumb Rubber: Odessa Texas
  • NCAT Draft Synopsis 24-01
  • ECR Improves Interstate Highway Safety and Performance
  • RED’S RIDE ACROSS OKLAHOMA ROLLS
  • Facebook
  • X
  • Instagram
  • RSS

Designed by Elegant Themes | Powered by WordPress